Handover inspection in Dubai
Your handover appointment is the moment of most leverage. Once you sign, it becomes harder to prove a defect was there from the start. A handover inspection gives you a documented list before you accept the keys.
What's included
- Full snagging of every room and system
- Photo evidence with exact locations
- Severity rating for each defect
- Report formatted for developer submission
- Advice on what to insist on before signing
How a handover inspection works
- You receive the handover notice from the developer
- We inspect on or before your appointment
- You submit our report to the developer
- The developer fixes the snags
- We re-inspect to confirm the fixes (optional)
When to book
As soon as you get the handover notice. Peak handover months fill up quickly, and booking early gives the developer time to fix issues before you move in.
Frequently asked questions
Should I sign the handover if there are defects?
Many developers let you sign with a snag list attached. Ask the developer to acknowledge our report in writing. If major issues exist, you can ask for them to be fixed before handover.
Can you attend the handover appointment with me?
Yes, an engineer can join you to walk through the main issues with the developer's representative.
Handover coming up? Don't sign until we've checked.
Tell us about your property and get your quote in seconds.